DCM Contact us
View all projects

Sherbrook, (Québec, Canada)

Fives Domtar (Bridge crane)

DCM has been awarded a mandate to perform electrical installation work at Fives as part of the renovation of a 60 ton overhead crane.

Scope

Electric & Instrumentation

Industry sector

Pulp & Paper

Fives Domtar (Bridge crane)

DCM has been awarded a mandate to perform electrical installation work at Fives as part of the renovation of a 60 ton overhead crane.The scope of work involved:
- Change of equipment on the overhead crane,
- Renewal of the electrical system,
- Change of the whole control system.

The work lasted one month and required the intervention of a team of eight (8) electricians.

Discover some of our related experience

Contact Us

Find out more about DCM

Integrated industrial and commercial construction services at your fingertips. Send us a message and a representative will get back to you.

View all contact informations

Thank you for your message.

Error