Hydro-Québec – Poste Bélanger
Hydro-Québec – Poste Bélanger
Power
Siemens Canada Ltd awarded DCM the mandate to install a 315KV sub-station for a Gas Insulated Switchgear (GIS).
Newington, Connecticut, United States
Scope
Electrical & Instrumentation
Industry sector
Power
Newington Energy – Thermal power plant with cogeneration (550MW)
DCM’s mandate was to complete electrical works and install instrumentation for the construction of two (2) gas turbines (GE) and one (1) vapor turbine (Toshiba), and for the entire power station. DCM installed and calibrated approximately 3000 instruments.
Hydro-Québec – Poste Bélanger
Hydro-Québec – Poste Bélanger
Power
Siemens Canada Ltd awarded DCM the mandate to install a 315KV sub-station for a Gas Insulated Switchgear (GIS).
New Brunswick Power – Thermal Power Plant Conversion
New Brunswick Power – Thermal Power Plant Conversion
Power
DCM was awarded the mandate to provide electrical and instrumentation services for the conversion of a thermal power plant.
Fort Hills Cogeneration Facility
Fort Hills Cogeneration Facility
Power
Finalization of multiple scopes including piping, mechanical, electrical, structural, building cladding, HVAC refrigerant and exhaust piping, air blowing and chemical flushing, general labouring activities and support services.
Find out more about DCM
Integrated industrial and commercial construction services at your fingertips. Send us a message and a representative will get back to you.
View all contact informationsBy completing this form, you accept that you may be contacted by one of our representatives for potential business opportunities.