Biomethanization Center
Biomethanization Center
Building
DAWCO was mandated by EBC to carry out the design-build work for the new biogas treatment center.
Miramichi (New Brunswick, Canada)
Scope
Electrical
Industry sector
Building
Miramichi Regional Hospital - Replacement of 2 Emergency Generators
The first part of this project consisted of the installation of a portable 1000kW generator. The second part consisted of the removal of the two generators to be replaced and the installation of two new 800kW generators. Our mandate also included upgrating the ventilation system, the capacity of which must be compatible with the new machines. New diesel tanks were also installed to serve as the fuel source for these new machines.
Biomethanization Center
Biomethanization Center
Building
DAWCO was mandated by EBC to carry out the design-build work for the new biogas treatment center.
Molson Valley
Molson Valley
Building
DAWCO has been awarded an electrical construction mandate for the construction of the new Molson brewery.
25kV Substation Modification, Control and Protection for the Joliette Tandem Mixer Expansion Project
25kV Substation Modification, Control and Protection for the Joliette Tandem Mixer Expansion Project
Building
As part of the Bridgestone plant expansion project in Joliette involving the addition of a building, DAWCO's team was mandated to modify the 25kV electrical distribution.